Licensed contractors › Washington › Trucking and hauling › Snohomish
Alternative Roofing Systems
Motor carrier (USDOT) · license 1896594 · held by Chris Romei
Currentas of Nov 21, 2026
What was checked
- License
- Current
- Insurance
- Not published by this agency
- Bond
- Not published by this agency
- Source
- Federal motor carriers: construction haulers with insurance filings Read Nov 21, 2026. The agency's own record is the authority.
Hiring this contractor?
Add them to a watched list and get an email before the license or insurance lapses.
Permitted jobs
4
permits in the last 12 months
10
permits since Mar 4, 2025
Permits per month, last 12 months
| Issued | Job | Where |
|---|---|---|
| Nov 11, 2026 | RoofingSee engineer's report for structural approval for roof overlay. Existing roof system consists of a base layer of asphalt built up roofing wi | 3256 Sw Avalon WaySeattle |
| Jul 13, 2026 | RoofingInstallation of 50mil Single-Ply PVC membrane and 3/8" FanFold Insulation over (1) existing layer of granulated torch down. No revisions to | 903 Bellevue Pl ESeattle |
| May 11, 2026 | RoofingRemoval of on layer of Torch Down roofing leaving base layer of Built Up Asphalt roof system in place. Installation of 3/8" FanFold insulat | 9420 16th Ave SwSeattle |
| Apr 8, 2026 | RoofingInstallation of 50mil Duro-Last PVC membrane over one layer of existing smooth torch down roofing. No revisions to existing R-Value or repl | 1925 Eastlake Ave ESeattle |
| Aug 27, 2025 | RoofingRemoval of existing roofing materials exposing plywood sheathing for inspection and or replacement if needed. Installation of (2) layers of | 9012 25th Ave NeSeattle |
| Aug 27, 2025 | RoofingInstallation of the 60mil Duro-Last Single-Ply PVC Membrane with HD Poly-ISO Coverboard over the existing layer of torch down membrane. N | 2330 2nd AveSeattle |
| Jun 11, 2025 | RoofingInstallation of (2) layers of 3.3" Poly-ISO Insulation to achieve required R-Value of 38 along with vapor barrier and Duro-Last Single-Ply P | 4555 15th Ave NeSeattle |
| Jun 11, 2025 | RoofingInstallation of 50mil Duro-Last Single-Ply PVC Membrane over one existing layer of torch down. No upgrades to R-Value required at this tim | 2010 Franklin Ave ESeattle |
From city permit records, matched on company name. A permit shows a job was filed, not how it went.