Licensed contractors › Texas › Electrical › Boerne
Brewster Electrical Services
Electrical Contractor · license 32800
Currentas of Nov 20, 2026
What was checked
- License
- Current expires Jan 20, 2027 (in 61 days)
- Insurance
- Not published by this agency
- Bond
- Not published by this agency
- Source
- Texas TDLR: electricians and A/C Read Nov 20, 2026. The agency's own record is the authority.
- Name on file
- BREWSTER ELECTRICAL SERVICES As the agency spells it.
Hiring this contractor?
Add them to a watched list and get an email before the license or insurance lapses.
Permitted jobs
2
permits in the last 12 months
10
permits since Nov 20, 2024
Permits per month, last 12 months
| Issued | Job | Where |
|---|---|---|
| Jan 28, 2026 | Electrical PermitRequest to Disconnect. Installing a 26Kw Generac Whole Home Standby Generator with 200Amp automatic transfer switch. | 3901 Petra PathAustin |
| Dec 5, 2025 | Electrical PermitRequest to Disconnect. Installing a 22Kw Generac Whole Home Standby Generator with 100Amp automatic transfer switch. | 5710 Fairlane DrAustin |
| Oct 23, 2025 | Electrical PermitRequest to Disconnect. Installing a 26Kw Generac Whole Home Standby Generator. One 150 amp automatic transfer switch installed at the 175 am | 8201 Denali Pkwy Unit 3Austin |
| Jul 10, 2025 | Electrical PermitRequest to Disconnect. Installing a 26Kw Generac Whole Home Standby Generator. One 200 amp automatic transfer switch installed at the 200 am | 3900 Ridgelea DrAustin |
| Jun 20, 2025 | Electrical PermitRequest to Disconnect. Installing a 24Kw Generac Whole Home Standby Generator with 200Amp automatic transfer switch. | 7406 West Rim DrAustin |
| Jan 20, 2025 | Electrical PermitRequest to Disconnect. Installing a 22Kw Generac Whole Home Standby Generator with 100Amp automatic transfer switch. | 1505 Wilson Heights DrAustin |
| Jan 20, 2025 | Electrical PermitInstalling a 18Kw Generac Whole Home Standby Generator with 100Amp automatic transfer switch. | 4504 Lareina DrAustin |
| Jan 20, 2025 | Electrical PermitRequest to Disconnect. Installing a 18Kw Generac Whole Home Standby Generator with 100Amp automatic transfer switch. | 13516 Hymeadow CirAustin |
From city permit records, matched on company name. A permit shows a job was filed, not how it went.