Tradesfile

Licensed contractors › Texas › Electrical › Manor

Fermin Electric

Electrical Contractor · license 40129

Currentas of Nov 20, 2026

What was checked

License
Current expires Apr 1, 2027 (in 132 days)
Insurance
Not published by this agency
Bond
Not published by this agency
Source
Texas TDLR: electricians and A/C Read Nov 20, 2026. The agency's own record is the authority.
Name on file
FERMIN ELECTRIC As the agency spells it.

Hiring this contractor?

Add them to a watched list and get an email before the license or insurance lapses.

Watch this contractor

Permitted jobs

18
permits in the last 12 months
25
permits since Jun 20, 2025
2025-12: 2 permits2026-01: 3 permits2026-02: 3 permits2026-03: 3 permits2026-06: 1 permit2026-07: 1 permit2026-08: 2 permits2026-09: 2 permits2026-10: 1 permitPermits per month, last 12 months
IssuedJobWhere
Oct 16, 2026Electrical PermitThe 100-amp main disconnect will be replaced with a new Square D unit of the same amperage (the existing one is faulty and keeps tripping; t9500 Dessau Rd Unit 324Austin
Sep 18, 2026Electrical PermitExterior electrical service upgrade: Install a new 200-amp meter box. Install a 200-amp main disconnect. Install new service drop cables. In1001 Chesapeake DrAustin
Sep 11, 2026Electrical PermitExpress: Replace drywall paint replace interior doors replace electrical outlets replace electrical box replace windows and exterior doors.1302 Harriet CtAustin
Aug 19, 2026Electrical PermitAddition/remodel- Remodel laundry. Add 1/2 bath kitchen and bathroom remodels add beams enclosing part of existing patio4201 Endcliffe DrAustin
Aug 14, 2026Electrical Permitneed a permit to install a temporary electrical pole which will be used to cover the electrical power supply for construction permit 2026-094201 Endcliffe DrAustin
Jul 13, 2026Electrical PermitPorch conversion on 1-story single family residence to conditioned space: Remove existing screen on covered back patio and replace with boa1721 E 38th Half StAustin
Jun 22, 2026Electrical PermitRepairs were made by replacing the lugs at the meter base and the main disconnect was replaced; this was an emergency call because the apart2207 S 5th St Unit 227Austin
Mar 18, 2026Electrical PermitThe existing electrical service will be demolished and a new one installed including a new electric meter box a new box with a main disconne3711 Werner AveAustin

From city permit records, matched on company name. A permit shows a job was filed, not how it went.