Licensed contractors › Washington › General contracting › Federal Way
Greencity Roofing & Siding LLC
Construction Contractor · license GREENRS783JJ · held by Alfredo Lopez Hernandez
Currentas of Nov 20, 2026
What was checked
- License
- Current expires Apr 11, 2028 (in 508 days)
- Insurance
- Current expires Feb 28, 2027 (in 100 days)
- Bond
- Not published by this agency
- Source
- Washington L&I: contractors with insurance Read Nov 20, 2026. The agency's own record is the authority.
- Name on file
- GREENCITY ROOFING & SIDING LLC As the agency spells it.
Hiring this contractor?
Add them to a watched list and get an email before the license or insurance lapses.
Permitted jobs
6
permits in the last 12 months
8
permits since Mar 24, 2025
Permits per month, last 12 months
| Issued | Job | Where |
|---|---|---|
| May 19, 2026 | RoofingBurke Gilman Apartments Bldg 29Remove and install new 1/2"inch CDX plywood over entire roof. Removal and disposal of 1 existing layer of old | 5100 40th Ave NeSeattle |
| May 1, 2026 | RoofingRemove and install new 1/2"inch CDX plywood over entire roof. Included in proposalRemoval and disposal of 1 existing layer of old roofing ma | 5100 40th Ave NeSeattle |
| Apr 29, 2026 | RoofingRemove and install new 1/2"inch CDX plywood over entire roof. Removal and disposal of 1 existing layer of old roofing material down to the p | 5100 40th Ave NeSeattle |
| Apr 25, 2026 | RoofingRemove and install new 1/2"inch CDX plywood over entire roof. Included in proposalRemoval and disposal of 1 existing layer of old roofing ma | 5100 40th Ave NeSeattle |
| Apr 20, 2026 | RoofingRemove and install new 1/2"inch CDX plywood included in proposalRemoval and disposal of 1 existing layer of old roofing material down to the | 5100 40th Ave NeSeattle |
| Apr 8, 2026 | RoofingROOF PREPARATION (REMOVAL/TEAR OFF) Remove the existing shingles along with current roof system down to the decking 1 Full Roof Deck Replace | 5100 40th Ave NeSeattle |
| Jun 20, 2025 | RoofingRemoval and disposal of 1 existing layer of old roofing material down to the plywood decking. Install 1/2" fanfold. New installation of a TP | 3600 S Oregon StSeattle |
| Mar 24, 2025 | RoofingROOF PREPARATION (REMOVAL/TEAR OFF)Remove the existing shingles along with current roof system down to the decking1Full Roof Deck Replacemen | 5100 40th Ave NeSeattle |
From city permit records, matched on company name. A permit shows a job was filed, not how it went.
Other licenses under this name
- Motor carrier (USDOT) Current 4394760 · Alfredo Lopez