Licensed contractors › New York › General contracting › Mamaroneck
Taconic Builders Inc
Superintendent Of Construction · license 25281 · held by Daniel Pineda
Lapsedas of Nov 20, 2026
What was checked
- License
- Lapsed
- Insurance
- Not published by this agency
- Bond
- Not published by this agency
- Source
- New York City DOB: licensed trades and contractors Read Nov 20, 2026. The agency's own record is the authority.
- Name on file
- TACONIC BUILDERS INC As the agency spells it.
Hiring this contractor?
Add them to a watched list and get an email before the license or insurance lapses.
Permitted jobs
15
permits in the last 12 months
23
permits since Mar 17, 2025
Permits per month, last 12 months
| Issued | Job | Where |
|---|---|---|
| Sep 11, 2026 | General ConstructionINTERIOR RENOVATION: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INSTALL REPLACEMENT | 60 Beach Street, ManhattanNew York |
| Jun 17, 2026 | General ConstructionGENERAL CONSTRUCTION ARCHITECTURAL FOR THE RENOVATION OF EXISTING DUPLEX APARTMENT 34B/35AB ON THE 34 & 35 FLOORS. AS PER PLANS FILED HEREWI | 200 East 89 Street, ManhattanNew York |
| Jun 15, 2026 | Mechanical SystemsInstallation of radiant flooring in one bedroom. Work is in conjunction with renovation on GC application, as per plans filed herewith. N | 139 East 79 Street, ManhattanNew York |
| Jun 15, 2026 | StructuralSTRUCTURAL WITH THE RENOVATION OF APARTMENT 34B/35AB ON THE 34 & 35 FLOOR. REPLACE EXISTING STAIR. AS PER PLANS FILED HEREWITH. NO CHANGE OF | 200 East 89 Street, ManhattanNew York |
| Jun 12, 2026 | General ConstructionRemoval and installation of non bearing partition at apartment vestibule, and related finishes, as per plans filed herewith. No change to u | 139 East 79 Street, ManhattanNew York |
| May 1, 2026 | Protection and Mechanical MethodsINSTALL TEMPORARY ROOF ENCLOSURE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 41 East 70 Street, ManhattanNew York |
| Dec 23, 2025 | General ConstructionINTERIOR RENOVATION OF PENTHOUSE APT 26B, AT THE 26th, 27th, 28th FLOORS AND ROOF AS PER PLANS FILED HEREWITH. | 270 Broadway, ManhattanNew York |
| Dec 17, 2025 | StructuralPARTIAL DEMOLITION FOR CREATION OF NEW SUBCELLAR. REMOVAL OF SLAB AND EXISTING STAIRS FOR INSTALLATION OF NEW STAIR AND ROOF BULKHEAD. WORK | 41 East 70 Street, ManhattanNew York |
From city permit records, matched on company name. A permit shows a job was filed, not how it went.
Other licenses under this name
- Home Improvement Contractor (NYC) Current 1091408-DCA
- Home Improvement Contractor (NYC) Current 2128964-DCWP
- Superintendent Of Construction Current 22190 · Glenn Rosati
- Superintendent Of Construction Lapsed 23021 · Pantoleone Brugellis
- General Contractor Current 4313 · Vincent Tyer 111
- Superintendent Of Construction Lapsed 23048 · James Petro
- Superintendent Of Construction Lapsed 21837 · Eddy Mcdougall
- Superintendent Of Construction Lapsed 23146 · Shawn Sidebottom
- Superintendent Of Construction Current 22271 · Randy Knizeski
- Superintendent Of Construction Lapsed 25319 · Enda Charles
- Superintendent Of Construction Lapsed 23787 · Patrick Fromm
- Superintendent Of Construction Lapsed 22590 · Thomas Mahoney