Tradesfile

Licensed contractors › New York › Other trades

Preferred Spklr and Mech

Fire Suppression Contractor · license 1038 · held by Sean Mackin

Currentas of Nov 20, 2026

What was checked

License
Current
Insurance
Not published by this agency
Bond
Not published by this agency
Source
New York City DOB: licensed trades and contractors Read Nov 20, 2026. The agency's own record is the authority.
Name on file
PREFERRED SPKLR AND MECH As the agency spells it.

Hiring this contractor?

Add them to a watched list and get an email before the license or insurance lapses.

Watch this contractor

Permitted jobs

77
permits in the last 12 months
133
permits since Dec 19, 2024
2025-12: 15 permits2026-02: 8 permits2026-03: 4 permits2026-04: 5 permits2026-05: 4 permits2026-06: 13 permits2026-07: 7 permits2026-08: 1 permit2026-09: 13 permits2026-10: 3 permits2026-11: 4 permitsPermits per month, last 12 months
IssuedJobWhere
Nov 5, 2026StandpipeFiling herewith modification to the existing sprinkler and standpipe system and the installation of a new sprinkler pre-acion system as per 1114 Avenue Of The Americas, ManhattanNew York
Nov 5, 2026StandpipeFiling herewith modification to the existing sprinkler and standpipe system and the installation of a new sprinkler pre-acion system as per 1114 Avenue Of The Americas, ManhattanNew York
Nov 4, 2026PlumbingModification to existing plumbing and sprinkler as per plans filed herewith. Removal of plumbing fixures and sprinkler heads. No change in u1 Broadway, ManhattanNew York
Nov 2, 2026SprinklersInstallation of a new sprinkler system on the 16th floor (Houlihan Lokey) as per plans. No change to use, egress or occupancy.245 Park Avenue, ManhattanNew York
Oct 23, 2026SprinklersModifications to the existing sprinkler system on the 16th floor (TD Bank- Marketing Floor 17) as per plans. No change to use, egress or occ125 Park Avenue, ManhattanNew York
Oct 16, 2026StandpipeInstallation of new fire hose cabinet on the 38th floors(ARES) as per plans. No change to use, egress or occupancy.245 Park Avenue, ManhattanNew York
Oct 16, 2026SprinklersModification to the existing sprinkler system on the 38th floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.245 Park Avenue, ManhattanNew York
Sep 29, 2026SprinklersModifications to the existing sprinkler system on the 20th and 21st floors (TD Securities- Marketing floors 21 + 22) as per plans. No change125 Park Avenue, ManhattanNew York

From city permit records, matched on company name. A permit shows a job was filed, not how it went.