Licensed contractors › New York › Concrete, masonry and tile › Maspeth
Casino Development Group
Concrete Test Lab / Safety Manager · license 2166 · held by Keith Van Sise
Lapsedas of Nov 20, 2026
What was checked
- License
- Lapsed
- Insurance
- Not published by this agency
- Bond
- Not published by this agency
- Source
- New York City DOB: licensed trades and contractors Read Nov 20, 2026. The agency's own record is the authority.
- Name on file
- CASINO DEVELOPMENT GROUP As the agency spells it.
Hiring this contractor?
Add them to a watched list and get an email before the license or insurance lapses.
Permitted jobs
12
permits in the last 12 months
18
permits since Jan 17, 2025
Permits per month, last 12 months
| Issued | Job | Where |
|---|---|---|
| Nov 9, 2026 | StructuralTHIS IS A INTERIOR DEMOLITION OF MEZZANINE ON 1 STORY C.M.U. & STEEL WITH CONCRETE BUILDING LOCATED AT 55-06 43rd STREET IN QUEENS N.Y.2. IN | 55-06 43 Street, QueensNew York |
| Oct 21, 2026 | Protection and Mechanical MethodsInstallation and use of concrete placing boom as per plans filed herewith. | 101 Franklin Street, ManhattanNew York |
| Sep 29, 2026 | Protection and Mechanical MethodsInstallation of five Titan outrigger platforms on each floor, from the 5th floor to the 29th floor. | 11 West 13 Street, ManhattanNew York |
| Aug 4, 2026 | Protection and Mechanical MethodsPLACING BOOM INSTALLATION. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS. | 1240 River Avenue, BronxNew York |
| Jul 22, 2026 | Protection and Mechanical MethodsINSTALLATION OF PLACING BOOM. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGREES. | 11 West 13 Street, ManhattanNew York |
| Jul 15, 2026 | Mechanical SystemsMechanical Systems for Interior alteration to create new restaurant Serafina. | 300 East 50 Street, ManhattanNew York |
| Jul 15, 2026 | General ConstructionInterior alteration to create new restaurant Serafina, install non-load bearing partitions. | 300 East 50 Street, ManhattanNew York |
| Jul 9, 2026 | General ConstructionGENERAL CONSTRUCTION TAKING PLACE ON CEL, 1ST, 2ND, 3RD FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 800 7 Avenue, ManhattanNew York |
From city permit records, matched on company name. A permit shows a job was filed, not how it went.
Other licenses under this name
- Superintendent Of Construction Current 21049 · Peter Colavito
- General Contractor Current 31161 · Peter Colavito
- Concrete Test Lab / Safety Manager Current 2039 · Peter Colavito
- Concrete Test Lab / Safety Manager Current 2609 · Freddy Pereira
- Concrete Test Lab / Safety Manager Lapsed 2134 · John Verrastro
- Concrete Test Lab / Safety Manager Current 2086 · William Charon
- Concrete Test Lab / Safety Manager Current 2177 · Carmine Graziano
- Concrete Test Lab / Safety Manager Lapsed 2641 · Ramazan Celik
- Motor carrier (USDOT) Current 1986307 · William Charon