Tradesfile

Licensed contractors › New York › Other trades

Clune Construction LP

Filing Representative · license 7845 · held by Elvira Ziljkic

Currentas of Nov 20, 2026

What was checked

License
Current
Insurance
Not published by this agency
Bond
Not published by this agency
Source
New York City DOB: licensed trades and contractors Read Nov 20, 2026. The agency's own record is the authority.
Name on file
CLUNE CONSTRUCTION LP As the agency spells it.

Hiring this contractor?

Add them to a watched list and get an email before the license or insurance lapses.

Watch this contractor

Permitted jobs

249
permits in the last 12 months
473
permits since Nov 25, 2024
2025-11: 4 permits2025-12: 21 permits2026-01: 14 permits2026-02: 22 permits2026-03: 18 permits2026-04: 23 permits2026-05: 22 permits2026-06: 29 permits2026-07: 23 permits2026-08: 16 permits2026-09: 11 permits2026-10: 21 permits2026-11: 25 permitsPermits per month, last 12 months
IssuedJobWhere
Nov 18, 2026General ConstructionFiling herewith drawings indicating interior renovations on the 12th floor. No change in use, egress, or occupancy under this application.600 Lexington Avenue, ManhattanNew York
Nov 17, 2026StructuralSTRUCTURAL MODIFICATIONS TAKING PLACE ON CEL, 1ST & 14TH (ROOF BULKHEAD) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY1372 Broadway, ManhattanNew York
Nov 16, 2026Mechanical SystemsFiling herewith drawings indicating modification of the Mechanical system on the 12th floor. No change in use, egress, or occupancy under th600 Lexington Avenue, ManhattanNew York
Nov 12, 2026General ConstructionArchitectural changes on the 26th floor as indicated on drawings.90 Park Avenue, ManhattanNew York
Nov 12, 2026Mechanical SystemsMechanical work on the 53rd floor (prebuild) as indicated on drawings.1 Penn Plaza, ManhattanNew York
Nov 10, 2026General ConstructionGeneral Construction to take place on the 4th Construction floor as per drawings filed herewith. No change in use, egress, or occupancy.605 Third Avenue, ManhattanNew York
Nov 9, 2026Mechanical SystemsMechanical modifications to take place on the 4th floor per drawings filed. No change in use, egress, or occupancy.605 Third Avenue, ManhattanNew York
Nov 9, 2026Mechanical SystemsMechanical changes on the 26th floor as indicated on drawings.90 Park Avenue, ManhattanNew York

From city permit records, matched on company name. A permit shows a job was filed, not how it went.

Other licenses under this name