Licensed contractors › New York › General contracting
Benchmark Builders
Superintendent Of Construction · license 28543 · held by Christopher Falcone
Currentas of Nov 20, 2026
What was checked
- License
- Current
- Insurance
- Not published by this agency
- Bond
- Not published by this agency
- Source
- New York City DOB: licensed trades and contractors Read Nov 20, 2026. The agency's own record is the authority.
- Name on file
- BENCHMARK BUILDERS As the agency spells it.
Hiring this contractor?
Add them to a watched list and get an email before the license or insurance lapses.
Permitted jobs
85
permits in the last 12 months
158
permits since Dec 2, 2024
Permits per month, last 12 months
| Issued | Job | Where |
|---|---|---|
| Nov 18, 2026 | StructuralINSTALL NEW STEEL MEMBERS TO SUPPORT NEW MOVABLE PARTITION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 101 Park Avenue, ManhattanNew York |
| Nov 18, 2026 | General ConstructionWork includes a Public Assembly space for the 3rd floor with a total occupant load of 86 & a posted maximum occupancy of 338 for the full fl | 5 Bryant Park, ManhattanNew York |
| Nov 10, 2026 | General ConstructionRemoval and installation of walls, doors, floor finishes and ceilings as per plans. No change to use, egress or occupancy. | 101 Park Avenue, ManhattanNew York |
| Nov 6, 2026 | General ConstructionINTERIOR DEMOLITION WORK ON THE 6TH & 7TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED | 30 Rockefeller Plaza, ManhattanNew York |
| Nov 4, 2026 | General ConstructionInterior demo of partitions, ceilings and doors for existing office space. No change in use, egress or occupancy. | 1 Liberty Plaza, ManhattanNew York |
| Nov 4, 2026 | StructuralReplacement of stairs at existing shaft wall, creating of new wall opening at existing masonry shaftwall, installation of floor and stair fr | 747 Washington Street, ManhattanNew York |
| Nov 4, 2026 | General ConstructionRenovation for increase in occupancy and egress change on 1st floor and renovation to Mezzanine and roof | 747 Washington Street, ManhattanNew York |
| Oct 29, 2026 | General ConstructionInterior Non-Load Bearing Demolition the the 2nd and 3rd Floors as per plans submitted herewith. No Change to Use, Occupancy, or Egress. | 499 Park Avenue, ManhattanNew York |
From city permit records, matched on company name. A permit shows a job was filed, not how it went.
Other licenses under this name
- NYS Contractor Registry Certificate (public work; a registration, not a license) Current 26-679VV-CR
- Superintendent Of Construction Current 22681 · Brian Tucci
- General Contractor Current 39625 · George Samiou
- Superintendent Of Construction Current 20693 · Anthony De Meo III
- Superintendent Of Construction Lapsed 28393 · Ralph Lorusso
- Superintendent Of Construction Current 28409 · Anthony Jakuc
- Superintendent Of Construction Lapsed 28418 · Richard Caston
- Superintendent Of Construction Current 28514 · Vincent Deluca
- Superintendent Of Construction Current 28521 · Phillip Shadood
- Superintendent Of Construction Lapsed 28583 · James Danner
- Superintendent Of Construction Current 29128 · Edward Cini
- Superintendent Of Construction Current 29340 · Michael Samiou