Licensed contractors › New York › General contracting › Mi, MA
Consigli Construction Co
Superintendent Of Construction · license 30775 · held by Kevin Link
Currentas of Nov 20, 2026
What was checked
- License
- Current
- Insurance
- Not published by this agency
- Bond
- Not published by this agency
- Source
- New York City DOB: licensed trades and contractors Read Nov 20, 2026. The agency's own record is the authority.
- Name on file
- CONSIGLI CONSTRUCTION CO As the agency spells it.
Hiring this contractor?
Add them to a watched list and get an email before the license or insurance lapses.
Permitted jobs
152
permits in the last 12 months
232
permits since Nov 19, 2024
Permits per month, last 12 months
| Issued | Job | Where |
|---|---|---|
| Nov 18, 2026 | Mechanical SystemsBMH RAD ONC 2: HVAC modifications, REPLACEMENT OF EXISTING AHU WITH NEW OUTDOOR AHU to accommodate Radiation Oncology Dept. in the existing | 506 6 Street, BrooklynNew York |
| Nov 18, 2026 | General ConstructionBMH RAD ONC 2: Modification to interior partitions & finishes, exterior acoustical screen installation, to accommodate the RADITATION ONCOLO | 506 6 Street, BrooklynNew York |
| Nov 17, 2026 | General ConstructionHSS@80: Modification of interior partitions and finishes to accommodate alterations for the new medical offices as per plans. | 1522 1 Avenue, ManhattanNew York |
| Nov 16, 2026 | Mechanical SystemsMHB 6HS: HVAC removals to accommodate renovation of the 6th floor hospital patient unit - 6 Hudson South, in the existing hospital building. | 177 Ft Washington Avenue, ManhattanNew York |
| Nov 16, 2026 | General ConstructionMHB 6HS: Interior demolition on partial 6th floor in the existing hospital including removal of partitions and finishes as per plans filed h | 177 Ft Washington Avenue, ManhattanNew York |
| Nov 10, 2026 | General ConstructionALT APP FILED HEREWITH TO SHOW THE TEMP FIRE-RATED ENCLOSURE AROUND A TEMP INT SYSTEM STAIR SERVING AS A SECOND MEANS OF EGRESS. SCOPE TO IN | 1740 Broadway, ManhattanNew York |
| Nov 4, 2026 | FoundationHOFFMAN HALL - FOUNDATION FOR NEW STAIR AND HANDICAP RAMPS IN THE OPEN SPACE WITHIN THE PROPERTY LINE AT THE BACK ENTRANCE OF THE BUILDING. | 180 10 Avenue, ManhattanNew York |
| Oct 21, 2026 | Mechanical SystemsFIT OUT_INFUSION 6TH, 7TH, 8TH FLOORS AND ROOF - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY | 56-45 Main Street, QueensNew York |
From city permit records, matched on company name. A permit shows a job was filed, not how it went.
Other licenses under this name
- NYS Contractor Registry Certificate (public work; a registration, not a license) Current 26-64DEB-CR
- Site Safety Current 2021 · Laura Bush
- Site Safety Current 1581 · Brad Groenendaal
- Site Safety Current 759 · Gerald Stern
- Superintendent Of Construction Current 23918 · Susan Kessel
- Site Safety Current 1201 · Pasquale Derobertis
- Superintendent Of Construction Current 25922 · Joseph Kehl
- Superintendent Of Construction Current 21942 · Michael Saracco
- Superintendent Of Construction Lapsed 22264 · Jaime Panich
- Superintendent Of Construction Current 25291 · Christopher Caulfield
- Site Safety Current 2525 · Michael Cassella
- Superintendent Of Construction Current 25809 · Vincent Arminio